OM chapter 2 problems

OM chapter 2 problems - Strayer University Bus 515...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Strayer University Bus 515 Operation Management Winter 2011 Ch2 problems (2-4-6-8) 2- Last week a painter painted three houses in five days. This week she painted two houses in four days. In which week was the painter more productive? First week = 3/5= 0.6 house per day Second week = 2/4= 0.5 house per day So the first week the painter was more productive 4- A company that makes kitchen chairs wants to compare productivity at two of its facilities. At facility #1, six workers produced 240 chairs. At facility #2, four workers produced 210 chairs during the same time period.Which facility was more productive? Facility#1 = 240/6 = 40 chair/worker Facility#2 = 210/4 = 55 chair/worker The 2 nd facility is more productive 6- Aztec Furnishings makes hand-crafted furniture for sale in its retail stores. The furniture maker has recently installed a new assembly process, including a new sander and polisher. With this new system, production has increased to 90 pieces of furniture per day from the previous 60...
View Full Document

This note was uploaded on 05/30/2011 for the course BUS 515 taught by Professor Blossom during the Spring '10 term at Strayer.

Page1 / 2

OM chapter 2 problems - Strayer University Bus 515...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online