Chapter 6. Capacity Planning Planning Long-Term Capacity Capacity Timing and Sizing Strategies A Systematic Approach to LT Capacity Decisions
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Capacity The throughput, or the number of The throughput, or the number of units a facility can hold, receive, units a facility can hold, receive, store, or produce in a period of time store, or produce in a period of time Determines fixed costs Determines fixed costs Determines if demand will be Determines if demand will be satisfied satisfied Three time horizons Three time horizons
Background image of page 2
Modify capacity Modify capacity Use capacity Use capacity Planning Over a Time Horizon Intermediate- Intermediate- range range planning planning Subcontract Add personnel Add equipment Build or use inventory Add shifts Short-range Short-range planning planning Schedule jobs Schedule personnel Allocate machinery * Long-range Long-range planning planning Add facilities Add long lead time equipment * * * Limited options exist Limited options exist
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Capacity planning (long-term) Economies and diseconomies of scale Capacity timing and sizing strategies Systematic approach to capacity decisions Constraint management (short-term) Theory of constraints Identification and management of bottlenecks Product mix decisions using bottlenecks Managing constraints in a line process Capacity management
Background image of page 4
Measures of Capacity Utilization Measures of Capacity Utilization Output measures of capacity Input measures of capacity Utilization Utilization = × 100% Average output rate Maximum capacity
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Assume this chart represents the hourly output capacity of a 6 machine assembly line. Assume this chart
Background image of page 6
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/06/2011 for the course MGSC 395 taught by Professor Zimmer during the Spring '10 term at South Carolina.

Page1 / 23

Ch6 - Chapter 6. Capacity Planning Planning Long-Term...

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online