Test 2 Study Test 2 Farmer CH 3 Planning/Design Flaws/ Issues-14 areas Farmer Ch 4 Planning Process Construction Options, Etc. Fried Ch 4 Design Team 10 Project Pitfalls Unique Features The Site (stop at Site Issues - is not on this test)
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Test 2 Material Starts Here This section will involve Farmer’s Ch 4 and Fried’s Chapter 4 DESIGNING, PLANNING & MANAGEMENT
Background image of page 2
Test 2 Material Starts Here Fried’s Chapter 4 Farmer’s Chapter 4 DESIGNING, PLANNING & MANAGEMENT
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Designing Construction options
Background image of page 4
Group Exercise- KEY 1. Facility Planning steps –in order: B. PROJECT APPROVAL A. BUDGET ESTABLISHED C. DESIGN PROCESS 1. What does it cost for the architect (as a percentage of the project cost) _ 7-10% 3. Stages of Design process - in order: B. SCHEMATIC C. DESIGN/DEVELOPMENT STAGE A. FINAL CONSTRUCTION DOCUMENT 4. Construction options – Match Concept on left with Indicator on right- See Lump Sum Contract = Most Traditional (One general contractor hires everyone else) Construction Manager = Oversees/ Serves as Liaison Design & Build = Architect & Builder- same firm
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CONSTRUCTION PROCESS FAST-TRACK Allows bids/even construction while some elements are still in design process (EX.DETAILED DESIGN) REDUCES CONSTRUCTION TIME MINIMIZES INTEREST COSTS REDUCES ESCALATION COSTS ACCELERATES PROJECT COMPLETION go ahead & pour the foundation
Background image of page 6
STRUCTURAL MATERIAL? What determines the type of materials used for the building?
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
OTHER CONSIDERATIONS STRUCTURAL MATERIALS DEPENDS ON SEVERAL FACTORS EX. COSTS, MAINT, CLIMATE FOUNDATIONS MOISTURE FROST SHIFTING
Background image of page 8
END – Farmer – Go to Fried Ch 4
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Sport Facility Management By Gil Fried Chapter 4 – Facility Planning
Background image of page 10
Goals Project Pitfalls (relating to planning) Project Timelines Uniqueness of Sport Facilities Site Selection
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
You want to build a multipurpose sport facility ( for ICA, general student body, faculty and community use) on campus.
Background image of page 12
Image of page 13
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/05/2011 for the course SMGT 4330 taught by Professor Burden during the Spring '11 term at Georgia Southern University .

Page1 / 46

SMGT 4330 Farmer CH 4 Fired ch 4 %26 5 DESIGN S 2011 Study Notes

This preview shows document pages 1 - 13. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online