PRE PHASE - SPRING 2011(2)

PRE PHASE - SPRING 2011(2) - MAKE THE FOLLOWING...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
STATE UNIVERSITY OF NEW YORK AT BUFFALO MAE 177 FINAL PROJECT PRELIMINARY PHASE SPRING 2011 WE HAVE NOW COVERED THE BASICS OF ENGINEERING DRAWING AND CAD, INCLUDING LINES, LETTERING AND ORTHOGRAPHIC PROJECTION. THIS PHASE OF THE FINAL PROJECT INCORPORATES THE “BELT TIGHTENER” DOWNLOAD IN UB LEARNS, ASSIGNMENTS. THE SUBJECT OF THIS PHASE IS THE BRACKET, PART #3, WHICH YOU HAVE PREVIOUSLY SKETCHED. USING THE GRIDED SKETCH PAPER FROM UB LEARNS: FREEHAND PENCIL SKETCH A THREE VIEW DETAILED WORKING DRAWING OF THE, BRACKET INCLUDING ALL THE DIMENSIONS AND NOTES NECESSARY TO MANUFACTURE THE OBJECT. DIMENSIONS MUST BE IN TWO-PLACE DECIMAL FORM. THE BRACKET MATERIAL IS SAE 1040 STEEL.
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: MAKE THE FOLLOWING REVISIONS: CHANGE THE 3/8 INCH DRILLED HOLES TO 7/16 inch AND ADD A THIRD HOLE IN THE CENTER OF THE BASE. (BE SURE TO NOTE THIS CHANGE IN THE LOWER LEFT HAND CORNER OF YOUR DRAWING). THIS SKETCH MUST BE OF SUCH DETAIL THAT YOU CAN HAND IT TO A CAD DRAFTSPERSON AND NO QUESTIONS WILL HAVE TO BE ASKED. AT THIS TIME WE HAVE NOT COVERED THREADS AND FASTENERS. THEREFORE, I WILL DEMONSTRATE THE PROPER REPRESENTATION OF THE TWO 5/8-11 UNC THREADED HOLES. THIS PHASE IS DUE IN CLASS ON OR BEFORE MARCH 23, 2011 PLEASE NOTE THE GRADE REDUCTION PENALTY FOR LATE ASSIGNMENTS AS OUTLINED IN THE SYLLABUS. THE SYLLABUS CAN BE FOUND IN UB LEARNS...
View Full Document

This document was uploaded on 06/06/2011.

Ask a homework question - tutors are online