Multiple choice questions based on week one lecture

Multiple choice - 1.,designthe system,buildit, systemsdevelop

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Multiple choice questions based on week one lecture 1. The process of understanding how an information system can support business needs, design the  system, build it, and deliver it to users is the _____. analysis phase of the SDLC object oriented approach rule for creating a CASE tool systems development life cycle  waterfall development methodology 2. The person that identifies opportunities for improvements and designs an information system to  implement them is called a(n) _____. computer programmer end-user systems analyst  systems specialist technical writer 3. The primary goal of the systems analyst is to _____. acquire a working tool create a wonderful system make a significant business impact  establish the three phases of the SDLC purchase a silver bullet 4. Developing an information system is similar to building a house because you have to start with a basic idea of what is needed create simple drawings of what is needed and allow the customer to provide feedback develop a detailed set of plans actually construct the project all of the above  5. The four phases of the Systems Development Life Cycle are _____. analysis, gathering, modeling, and diagramming construction, installation, testing, and converting designing, charting, formatting, and structuring planning, analysis, design, and implementation  system request, feasibility, planning, and staffing 6. Understanding why an information system should be built and determining how the project will be  built is part of the _____ phase of the SDLC. analysis 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
design gathering implementation planning 7. The _____ is generated by the department or person that has an idea for a new information system. feasibility analysis gradual refinement project sponsor system request  work plan 8. The project sponsor is the _____. lead systems analyst on the project team person or department that requested the system  computer programmer who writes the code for the system project team leader in charge of developing the system any of the above may fill the role of the project sponsor 9. Feasibility analysis examines several questions, including _____? Can we build it (technical feasibility) 
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/07/2011 for the course ECON 56 taught by Professor Buzz during the Spring '09 term at FSU.

Page1 / 7

Multiple choice - 1.,designthe system,buildit, systemsdevelop

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online