Activity based - Cost Drive Budgeted Cost Budgeted Activity Level Machine Setup Number of Setups $20,000 200 Inspection Number of inspections

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
A company has identified the following overhead costs and cost drivers for the coming year. Budgeted direct labor cost was $100,000, and budgeted direct material cost was $280,000. The following information was collected on three jobs that were completed during the year: a) If the company uses activity-based costing (ABC), how much overhead cost should be assigned to Job 101? b). If the company uses activity-based costing (ABC), what is the cost of each unit of Job 102? Overheahead Item
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Cost Drive Budgeted Cost Budgeted Activity Level Machine Setup Number of Setups $20,000 200 Inspection Number of inspections $130,000 6,500 Material handing Number of material moves $80,000 8,000 Engineering Engineering hours $50,000 1,000 Job 101 Job 102 Job 103 Direct materials $5,000 $12,000 $8,000 Direct labor $2,000 $2,000 $4,000 Units completed 100 50 200 Number of setups 1 2 4 Number of inspections 20 10 30 Number of mat'l moves 30 10 50 Engineering hours 10 50 10...
View Full Document

This note was uploaded on 06/07/2011 for the course ACCT 5230 taught by Professor Mel during the Spring '11 term at Uni. Lincoln.

Page1 / 2

Activity based - Cost Drive Budgeted Cost Budgeted Activity Level Machine Setup Number of Setups $20,000 200 Inspection Number of inspections

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online