Exam 2 Review - MIST 2090 Exam 2 Study Guide Serrano Spring 2011 Anything discussed in lecture or assigned to you as a reading is fair game for the

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
MIST 2090 Exam 2 Study Guide Serrano – Spring 2011 Anything discussed in lecture or assigned to you as a reading is fair game for the exam. This document is NOT designed to be a guide to everything on the exam. It’s designed to help communicate to you what I see as important ideas to help focus your study time. Although the procurement process was on the last exam, understanding it will still be important for this exam. Fulfillment Process What are the basic steps in the process? What functional units are involved in the process? Names and purposes of various documents involved in the process (particularly quotation, purchase order, sales order, picking document, packing list, and customer invoice) Different fulfillment strategies (Sell-from-stock, configure-to-order) and examples of each. Know strengths and weaknesses of these. Process-level and instance-level information flows. Make sure you understand examples of each. How do enterprise systems assist in fulfillment?
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/10/2011 for the course MIST 2090 taught by Professor Piercy during the Spring '08 term at University of Georgia Athens.

Page1 / 2

Exam 2 Review - MIST 2090 Exam 2 Study Guide Serrano Spring 2011 Anything discussed in lecture or assigned to you as a reading is fair game for the

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online