8833-3.f97 - Exam III(Final Mississippi State University...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Mississippi State University Department of Civil Engineering CE8833: Sludge Treatment and Disposal Fall 1997 Exam III (Final) D. D. Truax Name: Using the exam as a cover, present your solutions on separate paper in numerical order. Attach the solution sheets to this exam with a staple in the upper lefthand corner. Clearly and neatly present your solution with the final answer clearly indicated (e.g., circled, boxed, underlined) and start each problem on a new sheet. If a reference other than your notes is used, cite that reference. No help may be given or received on this exam. Each of the following problems are of equal value. Your solution to this exam must be submitted before 10:30 a.m. C.S.T. on Tuesday, December 9, 1997 . (40%) 1. Sufficiently explain: a) what NSPS are b) what a clinker is, where it might be found, and why, c) what autogenous combustion is and the sludge characteristics which control it, d) the conceptual similarities and differences between multi-hearth and fluidized bed incinerators,
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/12/2011 for the course CE 8833 taught by Professor Truax during the Spring '11 term at Mississippi State.

Page1 / 2

8833-3.f97 - Exam III(Final Mississippi State University...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online