PM UQ2 - What do you understand by the measurement of work...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
time for a job for the defined method?   a) b) c) d) Method study Motion economy Failure mode effect analysis Work measurement The is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. The is the maximum percentage defective that for the purpose of sampling inspection can be considered satisfactory as a process average. What can be the worst effect due to excessive vibration?   a) b) c) d) Reduced labour efficiency Breakdown Reduced machine efficiency Reduced salvage value of machine The plotting of activities - critical, non- critical and dummy activities- is strictly according to their precedence relationship.   True False 47. Plant Layout is concerned with optimum arrangement of the following   a) b) c) d) Storage space Machines Material Handling Equipment Sequence of operation Which of the following are assignable cause?  
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 4

PM UQ2 - What do you understand by the measurement of work...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online