POM 2 - Move order Move order Issue of tools for production...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
  Your Answer   Operation    Multiple Choice Single Answer   Question   What do you understand by the properties which are difficult to measure quantitatively  but usually measured by the comarision and then classification into acceptable or  unacceptable?   Correct Answer   Attributes   Your Answer   Tolerances    Multiple Choice Single Answer   Question   Which varaible is taken along the ordinate or Y axis?   Correct Answer   Quality   Your Answer   Time    Select The Blank   Question   The ________ is specified to indicate the maximum permissible variability in the  dimensions product or parts.   Correct Answer   Tolerance   Your Answer   Standard    Match The Following Question Correct Answer Your Answer Release of manufacturing orders Job card Job card Shop interdepartmental transport
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Move order Move order Issue of tools for production Tool order Tool order Return of surplus material Stores return note Stores return note Multiple Choice Multiple Answer Question Which of the following is not the characteristic of Project Production? Correct Answer Continuous flow of material , Highly mechanised material handling , Virtually zero manufacturing cycle time Your Answer Highly mechanised material handling , Fixed position layout , Virtually zero manufacturing cycle time True/False Question As a general rule, the number of tail event of an activity is more than that of it's head event. Correct Answer False Your Answer False Multiple Choice Multiple Answer 1 2...
View Full Document

This note was uploaded on 06/12/2011 for the course FINANCE PGP0810 taught by Professor Rc during the Spring '10 term at Symbiosis International University.

Page1 / 2

POM 2 - Move order Move order Issue of tools for production...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online