POM 3 - 1 POM(3 Question CorrectAnswer...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
  POM(3)     1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
 Multiple Choice Multiple Answer   Question   Which of the following can be subtypes of corrective maintenance?   Correct Answer   Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance    Your Answer   Shutdown Maintenance , Design-out Maintenance , Design-in Maintenance     Match The Following Question Correct Answer Your Answer Scheduling of interrelated activities  of small projects with consideration  of uncertainty of duration of  activities. Critical Path Analysis Critical Path Analysis depends on sequence of job  loading Johnson's Two Machine Algorithm Johnson's Two Machine Algorithm Sufficient orders and resonable  choice of machines Index Method Index Method Time relationship between when a  product is required and when it can  be made available Critical Ratio Scheduling Critical Ratio Scheduling    Multiple Choice Multiple Answer
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/12/2011 for the course FINANCE PGP0810 taught by Professor Rc during the Spring '10 term at Symbiosis International University.

Page1 / 3

POM 3 - 1 POM(3 Question CorrectAnswer...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online