POM 4 - 1 POM(4) YourAnswer...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
  POM(4)     1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
  Your Answer   Parallel critical path time minus Non-critical path time    Select The Blank   Question   Travel chart represents the quantitative data on material flow by recording distance and  ________ of movements between different pair of departments.   Correct Answer   Frequency   Your Answer   Time    Select The Blank   Question   The most commonly used methods employed to determine the critical path in case of  large networks are forward pass computation and ________.   Correct Answer   Backward path computation   Your Answer   Backward path computation    Multiple Choice Multiple Answer   Question   Which of the following aspects are essential to ensure quality of purchased items?   Correct Answer   Defining right quality for the job , Vendor performance evaluation , Making sure that  suppliers understand the requirements    Your Answer  
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/12/2011 for the course FINANCE PGP0810 taught by Professor Rc during the Spring '10 term at Symbiosis International University.

Page1 / 3

POM 4 - 1 POM(4) YourAnswer...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online