POM 5 - 1 POM(5 2 SelectTheBlank Question The_...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
  POM(5)     1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
   Select The Blank   Question   The ________ is the maximum percentage defective that for the purpose of sampling  inspection can be considered satisfactory as a process average.   Correct Answer   Acceptable quality level   Your Answer   Consumer's risk    True/False   Question   One major difference between CPM and PERT is the former's adaptability for the  projects where high degree of uncertainty prevails and activity times during performance  are expected to vary considerably for certain activities.   Correct Answer   False   Your Answer   True    Select The Blank   Question   The ________ breakdowns usually cost more, partly due to damage done to the  adjustment components and partly due to emergency actions.   Correct Answer   Unexpected   Your Answer   Partial    True/False   Question   Every network does not necessarily have a critical path.   Correct Answer  
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/12/2011 for the course FINANCE PGP0810 taught by Professor Rc during the Spring '10 term at Symbiosis International University.

Page1 / 3

POM 5 - 1 POM(5 2 SelectTheBlank Question The_...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online