The Basics of Capital  Budgeting Chapter 11 Should we  build this plant? 11-1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
What is capital budgeting? Analysis of potential additions to fixed assets. Long-term decisions; involve large  expenditures. Very important to firm’s future. 11-2
Background image of page 2
Steps to Capital Budgeting 1. 2. Assess riskiness of CFs. 3. Determine the appropriate cost of capital. 4. Find NPV and/or IRR. 5. Accept if NPV > 0 and/or IRR > WACC. 11-3
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
What is the difference between independent  and mutually exclusive projects? Independent projects – if the cash flows of  one are unaffected by the acceptance of the  other. Mutually exclusive projects – if the cash flows  of one can be adversely impacted by the  acceptance of the other. 11-4
Background image of page 4
What is the difference between normal and  nonnormal cash flow streams? Normal cash flow stream – Cost (negative  CF) followed by a series of positive cash  inflows.  One change of signs. Nonnormal cash flow stream – Two or more  changes of signs.  Most common:  Cost  (negative CF), then string of positive CFs,  then cost to close project.  Nuclear power  plant, strip mine, etc. 11-5
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Net Present Value (NPV) Sum of the PVs of all cash inflows and  outflows of a project: 11-6 = + = N 0 t t t )     1   ( CF   NPV 
Background image of page 6
What is Project L’s NPV? 11-7 Year  CF t   PV of CF t   -100  -$100  10  9.09  60  49.59  80      60.11       NPV L  =  $  18.79 
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Financial Calculator Solution Enter CFs into the calculator’s CFLO register. 11-8
Background image of page 8
Image of page 9
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 28

Chapter 11 - Chapter11 TheBasicsofCapital Budgeting...

This preview shows document pages 1 - 9. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online