Process Improvement Plan

Process Improvement Plan - ProcessImprovementPlan:Operations

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Process Improvement Plan: Operations Process Improvement Plan Your name OPS/571 The purpose of this paper is to outline the process improvement plan to include the statistical process control  identified in week one. To begin, I will explain the control limits, discuss the effect of seasonal factors and the  confidence intervals and their usefulness based on the number of data points. For the past five weeks I have  been monitoring and reviewing the process of posting the assignments on time as reviewed in the syllabus.  The week consists of Monday through Monday postings with four days to post up to two substantive  comments, discussion questions and for this class there have been three individual assignments due on week  one, week three and week five. The process improvement is to reduce the wait time in starting the required  assignments. Statistical Process Control Statistical Process Control (SPC) is a technique for testing a random sample of output  from a process to determine whether the process is producing items within a prescribed range (Chase, Jacobs,  determining if it can be done better. The process I have chosen to monitor is when to start my assignments  over the past five weeks. All papers and postings, I expected an “A”; however, not having a complete  understanding of the concepts, I did not. The proposed process improvement plan will satisfy the bottleneck in the process of waiting until the end of  the week to start discussions and papers to ensure full understanding of the concepts; however, this delay  resulted in poorly written papers because it did not give me adequate time to ask questions. The bottleneck is  for me to start my discussion questions, add substantive comments to others discussion questions, and apply  concepts earlier in the week. Control Limits The ideal measurement of the process would be to have had more than. ..  Our Blog
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
ESSAYS FOR ALL Process Improvement Plan During the first week of this class, I created a flowchart to show the process I go through in my standard,  everyday morning. The purpose of creating the flowchart was to determine a more effective way to utilize my  time in the morning, to identify any potential bottlenecks in my process and to maximize the limited time I  do have in the mornings. The statistical process control for my morning routine process will be used to ensure that my standard process 
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/13/2011 for the course OPS 571 taught by Professor Tinkleboo during the Spring '11 term at DeVry Austin.

Page1 / 5

Process Improvement Plan - ProcessImprovementPlan:Operations

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online