Chapter 9 Review - Total Direct Cost $680 Project Duration 15 weeks CIS 550 Chapter 9 Total Direct Cost $720 Project Duration 14 weeks Total Direct

Info iconThis preview shows pages 1–12. Sign up to view the full content.

View Full Document Right Arrow Icon
F 2 C 4 A 5 I 3 G 5 D 2 H 2 E 5 B 3 F 2 C 4 A 5 I 3 G 5 D 1 H 2 E 5 B 3 F 2 C 4 A 4 I 3 G 5 D 1 H 2 E 5 B 3 F 1 C 4 A 4 I 3 G 4 D 1 H 2 E 4 B 3 F 1 C 4 A 4 I 2 G 4 D 1 H 2 E 4 B 3 C 1 A 4 F 5 I 2 G 2 D 4 B 7 H 2 E 5 C 1 A 4 F 5 I 2 G 2 D 4 B 7 H 1 E 5 C 1 A 4 F 5 I 2 G 2 D 4 B 6 H 1 E 5 C 1 A 4 F 5 I 2 G 2 D 4 B 5 H 1 E 5 C 1 A 4 F 5 I 2 G 2 D 3 B 5 H 1 E 4 C 1 A 3 F 5 I 2 G 2 D 2 B 5 H 1 E 3 C 1 A 3 F 4 I 2 G 1 D 2 B 5 H 1 E 2 CIS 550 / Chapter 9 Chapter 9 Review Exercises 9-E3 Initial Project Duration: 15 time units Total Direct Cost: $730 Project Duration: 14 time units
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CIS 550 / Chapter 9 Total Direct Cost: $740 Project Duration: 13 time units
Background image of page 2
CIS 550 / Chapter 9 Total Direct Cost: $760 Project Duration: 12 time units
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CIS 550 / Chapter 9 Total Direct Cost: $950 Project Duration: 11 time units
Background image of page 4
CIS 550 / Chapter 9 Total Direct Cost: $1150 Project Duration 15 14 13 12 11 Direct Costs 730 740 760 950 1150 Indirect Costs 90 70 50 40 30 Total Project Cost $820 $810 $810 $990 $1180 The optimum cost-time schedule for the project is either 13 or 14 time units. In either case the cost is $810. 9-E4 Initial Project Duration: 16 weeks
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CIS 550 / Chapter 9
Background image of page 6
Background image of page 7

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 8
Background image of page 9

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 10
Background image of page 11

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 12
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Total Direct Cost: $680 Project Duration: 15 weeks CIS 550 / Chapter 9 Total Direct Cost: $720 Project Duration: 14 weeks Total Direct Cost: $790 Project Duration: 13 weeks CIS 550 / Chapter 9 Total Direct Cost: $860 Project Duration: 12 weeks CIS 550 / Chapter 9 Total Direct Cost: $930 Project Duration: 11 weeks CIS 550 / Chapter 9 Total Direct Cost: $1010 Project Duration: 10 weeks CIS 550 / Chapter 9 Total Direct Cost: $1290 Project Duration 16 15 14 13 12 11 10 Direct Costs 680 720 790 860 930 1010 1290 Indirect Costs 1200 1130 1000 900 860 820 790 Total Project Cost $1880 $1850 $1790 $1760 $1790 $1830 $2080 CIS 550 / Chapter 9...
View Full Document

This note was uploaded on 06/15/2011 for the course CIS 550 taught by Professor Teller during the Summer '11 term at CSU Dominguez Hills.

Page1 / 12

Chapter 9 Review - Total Direct Cost $680 Project Duration 15 weeks CIS 550 Chapter 9 Total Direct Cost $720 Project Duration 14 weeks Total Direct

This preview shows document pages 1 - 12. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online