12 D 32 0 12 20 32 0 A 5.3 0 0 7 5.3 38 J 43 0 38 5 43 32 H 38 0 32 6 38 23 F 30 2 25 7 32 12 E 23 2 14 11 25 7 C 12 0 7 7 12 30 I 39 4 34 9 43 12 G 24 8 20 12 32 43 K 72.7 0 43 29.7 72.7 0 B 4.3 2.7 2.7 4.3 7 CIS 550 / Chapter 8 Case: International Capital, Inc. Activ ity a m b t e σt e 2 A 4 7 10 7.0 1.0 B 2 4 8 4.3 1.0 C 2 5 8 5.0 1.0 D 16 19 28 20.0 4.0 E 6 9 24 11.0 9.0 F 1 7 13 7.0 4.0 G 4 10 28 12.0 16.0 H 2 5 14 6.0 4.0 I 5 8 17 9.0 4.0 J 2 5 8 5.0 1.0 K 17 29 45 29.7 21.8 Network Diagram
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CIS 550 / Chapter 8
Background image of page 2
CIS 550 / Chapter 8
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CIS 550 / Chapter 8
Background image of page 4
CIS 550 / Chapter 8
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CIS 550 / Chapter 8 Critical Path: A, C, D, H, J, K T E = 7 + 7 + 20 + 6 + 5 + 29.7 = 72.7 σ TE = ( ∑σt e 2 ) = ( 1 + 1+ 4 + 4 + 1 + 21.8) = 5.73 Z = (T S – T E )/ σ TE = (70 – 72.7)/5.73
Background image of page 6
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: = -.47 The probability that the project will be completed within 70 workdays is approximately 32 percent. 95 percent probability equates to approximately Z = 1.6 T E = T S Z( TE ) = 70 1.6(5.73) = 60.83 In order to have a 95 percent chance of completing the project in 70 workdays, the critical path duration of this project would have to be approximately 60.8 days....
View Full Document

This note was uploaded on 06/15/2011 for the course CIS 550 taught by Professor Teller during the Summer '11 term at CSU Dominguez Hills.

Page1 / 6

International Capital Case - = -.47 The probability that...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online