32) Managerial Financial Accounting Assignments AP7-17 (a) Solution

32) Managerial Financial Accounting Assignments AP7-17 (a) Solution

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
AP7-17 (a)
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Incorrect. (Appendix) Batch Size Decision and Constraints [LO A1] At Dalton Playground Equipment, the powder-coating process is a bottleneck. Typically, it takes approximately two hours to switch between jobs. The time is spent cleaning nozzles and paint tanks and recalibrating equipment. Currently the company runs relatively small batch sizes through the process but is considering increasing them to reduce setup time. With small batch sizes, powder coating can process approximately 2,200 units per 8-hour
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: shift, and products have an average contribution margin of $55. With large batch sizes, powder coating can process approximately 2,980 units per 8-hour shift. Calculate the additional profit associated with running larger batch sizes through the powder-coating process. $[no answer] Click here if you would like to Show Work for this question AP7-17 (a) Additional units in 8 hour shift 780 Times average contribution margin $55 Additional profit per 8 hour shift with larger batch sizes $42,900...
View Full Document

This note was uploaded on 06/21/2011 for the course MANAGERIAL MT425 taught by Professor Hodgson,k during the Spring '11 term at Kaplan University.

Page1 / 2

32) Managerial Financial Accounting Assignments AP7-17 (a) Solution

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online