Benchmark and Line Flow Worksheets

Benchmark and Line Flow Worksheets - Line Flow Calculation...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
Line Flow Calculation Worksheet Adjustable Parameters Arrival parameters Process parameter ra ta ca m rp tp WS 1 10 0.1 1.00 1 12 0.083 WS 2 10 0.1 1.00 1 12 0.083 WS 3 10 0.1 1.00 1 12 0.083 Total 0.250
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
rs cp u wq w cd TH WIP 1.000 83.3% 0.380 0.4637 1.0000 10.00 4.6 1.000 83.3% 0.380 0.4637 1.0000 10.00 4.6 1.000 83.3% 0.380 0.4637 1.0000 10.00 4.6 1.141 1.3911 13.91
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Bottleneck Rate (units / time) rb 0.13 cust/min Total Processing Time (time) To 39 mins Critical WIP Inventory (units) Wo 4.88 user defined Best Case Worst Case Practical Worst Case Inventory CT TH CT TH CT TH 2 39.0000 0.0513 78.0000 0.0256 47.0000 0.0426 4 39.0000 0.1026 156.0000 0.0256 63.0000 0.0635 6 48.0000 0.1250 234.0000 0.0256 79.0000 0.0759 8 64.0000 0.1250 312.0000 0.0256 95.0000 0.0842 cycle time 5 mins →→→→ 8 mins →→→→ 14 mins →→→→ 12 mins resources 1 mach 1 mach 3 mach 2 mach process rate 0.2 0.13 rb = 0.167 units per min. To =
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 9

Benchmark and Line Flow Worksheets - Line Flow Calculation...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online