leadership project

leadership project - Jordan Poznick HRTM 110 Section 002 24...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Jordan Poznick HRTM 110 Section 002 24 March 2011 Leadership Project Camp1 8:00am All forty mean will be split into eight different teams with unique assignments. There will be six teams of five men equipped with one truck per team and a chain saw, shovel, and indian pump per man. Two teams of five with one truck per team will travel to the path entrance way of Mount Matt, where they will exit their trucks to go warn the two hundred boy scouts about the oncoming danger of the wildfire. Each man will bring along with him a shovel and indian pump. It will take the ten men approximately thirty minutes to reach the boy. A team with truck 1 will travel to the path entrance disregard their truck and travel to the top of Mount Matt to start evacuating the two hundred boy scouts. B team with truck 2 will assist A Team in the evacuation of the boy scouts off Mount Matt. The next two teams of five men each and two trucks will follow behind A and B team to the entrance way of Mount Matt. One team will travel three fourths the way up the path to start clearing out a bigger path way and protecting the path way from the oncoming fire, while the other team will go one fourth the way up the trail to do the same so that the evacuating boy
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
scouts will be safe traveling back down the trail. On each team of five there will be two men with chain saws and three men equipped with a shovel and indian pump each. The chain saw men will start clearing away any large trees that may stall the evacuation and also clear away trees to slow down the oncoming wildfire. The men with shovels and indian pumps will place dirt and water on the fallen trees to also prevent the fire from moving and growing. C team with truck 3 will travel to the entrance way to the path that travels up Mount Matt. They will exit their vehicle and travel ¾’s the trail to start clearing the pay way and protecting it from the potential fire. Two men will carry chain saws while the other three bring a shovel and indian pump D team with truck 4 will follow behind C team. D team will travel ¼ the trail to start also clearing it out and protecting it from the potential fire. D team will also have two chain saw men and three men with a shovel and indian pump each. The next ten men will be instructed to travel to the midway point on the dirt path that splits camp one from camp two. This will take approximately thirty minutes to reach. The groups will be split up into one group of five men equipped with shovels, chain saws, and indian pumps
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 07/02/2011 for the course HRTM 110 taught by Professor Coon during the Spring '11 term at South Carolina.

Page1 / 7

leadership project - Jordan Poznick HRTM 110 Section 002 24...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online