MIE376 Lec9 DWD Incomplete.page1

MIE376 Lec9 DWD Incomplete.page1 - 1 (ton/ton of steel) 1...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
MIE376 Mathematical Programming Lecture Notes Daniel Frances 2011 1 Lecture 5: Dantzig-Wolfe Decomposition – Applying the CG Principles Having seen the power of complementing a LP problem, with a sub-problem, it occurred to the inventors of the column generation method that perhaps a similar approach could be used to decompose large LPs of a special nature. Very often large LPs look like they started as the combination of smaller LPs. To be more precise consider the following example. Consider two independent steel plants (Pike and Quid) each producing two types of steel, type 1 and type 2, from iron core (tons), coal (tons) and blast furnace (hrs). They each sell the two types of steel at the same market price ($170 per to of steel 1, $160 per ton of steel 2), to a single customer. Plant 1 (Pike Plant) Resource requirements for the Pike Plant are as follows Product Iron Coal Furnace Steel 1 8 (ton/ton of steel) 3 (ton/ton of steel) 2 (hrs/ton of steel) Steel 2 6 (ton/ton of steel)
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 1 (ton/ton of steel) 1 (hrs/ton of steel) Availability 30 tons 12 tons 10 hrs It costs $80 to ship a ton of steel from the Pike Plant to the customer. The LP used to produce the best production levels at this Plant is thus Let P i be the tons of steel i produced Max 90P 1 + 80P 2 subject to 8P 1 + 6P 2 30; 3P 1 + P 2 12; 2 P 1 + P 2 10; P i 0 Currently the optimal solution is for Pike to make no Steel 1, 5 tons of Steel2, at a revenue of $400. Its production limited by the availability of iron. Plant 2 (Quid Plant) Resource requirements by Quid are as follows Product Iron Coal Furnace Steel 1 7 (ton/ton of steel) 3 (ton/ton of steel) 1 (hrs/ton of steel) Steel 2 5 (ton/ton of steel) 2 (ton/ton of steel) 1 (hrs/ton of steel) Availability 30 tons 15 tons 4 hrs It costs $100 to ship a ton of steel from Quid to the customer. The LP used to produce the best production levels at this plant is thus Let Q i be the tons of steel i produced...
View Full Document

This note was uploaded on 07/10/2011 for the course MIE 376 taught by Professor Daniel during the Spring '11 term at University of Toronto- Toronto.

Ask a homework question - tutors are online