2294 MT2 Exam review

2294 MT2 Exam review - FMGT 2294 Mid-Term 2 Exam Review...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
FMGT 2294 Mid-Term 2 Exam Review Questions 1 .Hasty Hardwood Floors installs oak and other hardwood floors in homes and businesses. The company uses an activity-based costing system for its overhead costs. The company has provided the following data concerning its annual overhead costs and its activity-based costing system: Overhead Costs: Production Overhead $190,000 Office Expense $140,000 Total $330,000 Distribution of Resource Consumption: The "Other" activity cost pool consists of the costs of idle capacity and organization- sustaining costs. The amount of activity for the year is as follows: Activity Cost Pool Annual Activity Installing Floors 200 squares Job Support 160 jobs Other Not applicable 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
A "square" is a measure of area that is roughly equivalent to 1,000 square metres. Required: a) Prepare the first-stage allocation of overhead costs to the activity cost pools by filling in the table below: Installing Job Floors Support Other Total Production Overhead Office Expense Total. b) Compute the activity rates (i.e., cost per unit of activity) for the Installing Floors and Job Support activity cost pools by filling in the table below: Installing Job Floors Support Production Overhead Office Expense Total. c) Compute the overhead cost, according to the activity-based costing system, of a job that involves installing 3.4 squares. 2 .ABC Company's total overhead costs at various levels of activity are presented below: Assume that the overhead costs above consist of utilities, supervisory salaries, and maintenance. At the 50,000-machine-hour level of activity, these costs are presented below: The company wants to break down the maintenance cost into its basic variable and fixed cost elements. Required:
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/24/2011 for the course FMGT 2294 taught by Professor Jeyakumar during the Spring '10 term at Langara.

Page1 / 10

2294 MT2 Exam review - FMGT 2294 Mid-Term 2 Exam Review...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online