Click to edit Master subtitle style 7/7/11 Shantigram Site Office
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
7/7/11 3.9 m 3.9 m 3.9 m Length = 21m, Width – 4, Height = 10 feet, 3.05 metre Floor Area = 84 Sq. Metre. AC – 12 Tons No. of Ac’s – 6 Ac’s operate for 9 hrs per day for all 7 days a week, @ 19degree Celsius. 3.5 m 3.5 m 5.2 m 2 m
Background image of page 2
7/7/11 Power Market Structure Long term PPAs Day Ahead Scheduling Intra Day Bilateral Contracts Real time Balancing through UI(Unschedule d Interchange) & load scheduling IEX RLDCs Upper price cap on UI, Congestion Charges (Rs. 3 / Kwh)
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
7/7/11 Ministry of Power, GOI Electronic Trading Platform (Multiple Power Exchange) Trading Companies State Controlled: Generation Transmissio Centrally owned companies : NTPC, NHPC,
Background image of page 4
Background image of page 5
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: NEEPCO, NPCIL, PGCIL, PFC, REC (Rural Electrificat ion) CE A SLD Cs MoP, State Govern ment UM PPs State IPPs R&D, CPRI, NPTI, PSTI NLD C RLD C Appel late Tribu nal Autho rity CERC SERC Foru m of Regul ators 7/7/11 Typical Project Structure NON RECOURSE DEBT Inter-Credit Agreement LABOUR Input COAL or GAS Supply Contract Multilatera l, Bilateral, BANK SYNDICA TE PROJECT COMPANY Power Plant Letter of Credit, Escrow Account SPONSO R A EQUITY Shareholder Agreement Merchant Power Output POWER SUPPLY Off-take Agreeme nt SPONSO R B SPONSO R B Construction , Equipment, Operating and Host Government: Legal System, Property Rights, Regulation and Permits,...
View Full Document

{[ snackBarMessage ]}

Page1 / 5

REC1 - NEEPCO NPCIL PGCIL PFC REC(Rural Electrificat ion CE...