QUICK IP - Pipeline Projects GAIL's new pipelines under...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
Pipeline Projects GAIL’s new pipelines – under implementation (length and investment figures include spurlines) Sr. No. Pipeline Length Estimated Investment 1 Chainsa – Jhajjhar – Hissar pipeline 450 km. Rs. 1,250 crore 2 Dadri – Bawana – Nangal pipeline 610 km. Rs. 2,200 crore 3 Dabhol – Bengaluru pipeline 1,389 km. Rs. 4,543 crore 4 1,114 km. Rs. 3,032 crore 5 610 km. Rs. 5,000 crore Dahej – Vijaipur section 6 505 km. Rs. 5,500 crore Vijaipur – Dadri section 7 Jagdishpur – Haldia pipeline 2,050 km. Rs. 7,600 crore 8 275 km. Rs. 250 crore 9 70 km. Rs. 200 crore Bajera – Agra – Ferozabad section Kochi  –  Kanjirkkod  –  Bengaluru  –  Mangalore pipeline Capacity Augmentation  Capacity Augmentation  Karanpur – Moradabad – Kashipur  – Rudrapur pipeline Capacity Augmentation 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Cost / Km Cost of Service Method 2.78 3.61 Cost of Service (COS) method based transmission tariff comprises of three elements 3.27 2.72 1. Operating Cost 8.2 2. Depreciation 10.89 3. Return on Asset Base 3.71 0.91 2.86 How to calculate: 1. Calculation of Asset Base: 2. Depreciation: Depreciation is calculated considering the life of the Pipeline. 3. Operating Cost: 4. Return on Asset Base: Tariff  is  calculated  for  specified  block  period  based  on  estimated  investment,  tax  rate,  inflation  rate  and  volume  during  the  period.  At  the  end  of  the  specified  period  tariff  is  reviewed considering the actual capital cost incurred, volumes transported, inflation rate  and the tax rate. Any over or under recovery is adjusted in the tariff of next block period. Asset  Base  is  the  total  cost  of  the  pipeline  and  its  facilities  and  cost  of  any  expected  investment in the next five years. debts are considered operating cost at predefined percentage.
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Return  is  generally  based  on  the  weighted  average  cost of  capital.  The  net fixed  asset  base is arrived after deducting the accumulated depreciation from the Gross Asset Block.  Cost of capital is weighted average of debt and equity. Net asset value is calculated by  deducting the accumulated depreciation cost from the network. Accumulated depreciation  is calculated from the date of capitalisation till the calculation year. The  Total  of  Depreciation,  Operating  Cost  and  Return  is  the  Network  Revenue  requirement. The Net Present Value of required revenues as arrived above over a specified period is 
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 06/26/2011 for the course INFRASTRUC 401 taught by Professor Adi during the Spring '11 term at Aims Community College.

Page1 / 55

QUICK IP - Pipeline Projects GAIL's new pipelines under...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online