DP2_Group_V3

DP2_Group_V3 - Click to edit Master subtitle style Movable...

Info iconThis preview shows pages 1–13. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Click to edit Master subtitle style Movable Photovoltaic in Commercial Buildings Presented by GROUP 13: Azraf Hipni 260278238 Nurul Hanim Hashim 260278230 Sivapriya Prem Kumar 260261057 Violet Kharadabineh 260159150 11 Supervisor: Prof Geza Joos presentation outline Design Statement Building Profile Photovoltaic System Power output Weather dependency Financial Analysis GHG Evaluation and overheating solution 22 Design Project 1- GR1- Movable Solar Panel March 30th, 2011 Design Statement Model a solar power system that includes a solar tracking device in order to increase efficiency We aim to argue that efficiency will result in lower $/kWh Environmental and social 33 BUILDING PROFILE McGill University’s M. H. Wong Building 44 Figure 1: Wong Building. (Credit: https://home.mcgill.ca/engineering//buildings/wong) Selection Factors Flat roof 55 Selection Factors Flat roof High energy consumptions 5th highest energy consumer among other 32 McGill University’s building – average of 523,355 kWh /month 66 Figure 2: Energy Consumption of McGill University’s Building in 3 months. (Credit: http://my.pulseenergy.com/mcgill/dashboard#/comparison/1102) Building Plan Composed of 2 sections: The older Foster section Main wing, located on north of Foster Project will be implemented in the main wing – higher altitude 77 Available Area The rooftop of the main wing has a gross area of 796m2. Only 693 m2 is usable. 88 constraints Space Loading Fixing Fire Safety Cost 99 Design Project 2- GR13- Movable Solar Panel June 6th, 2011 Solar tracker (opel sf- 4 m) 10 10 Design Project 2- GR13- Movable Solar Panel March 30th, 2011 Source: http://www.opelinc.com/trackers.html Solar tracker (cont’D) 11 11 Design Project 2- GR13- Movable Solar Panel June 6th, 2011 Source: http://www.opelinc.com/trackers.html Solar panel o Schüco MPE 175 MS...
View Full Document

This note was uploaded on 07/11/2011 for the course ECSE 475 taught by Professor Radecka during the Spring '11 term at McGill.

Page1 / 37

DP2_Group_V3 - Click to edit Master subtitle style Movable...

This preview shows document pages 1 - 13. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online