Example of a Work Breakdown Structure

Example of a Work Breakdown Structure - Groups Coordination...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
4)  Work Breakdown Structure: Egg Moving System Conveyor Belt Cardboard and Chart  Paper Rails Funnel The Sweeper Movable  Wall  Level 1 Level 2 Level  3 Cardboard  Rails  Chart  Paper  Pipes Sponge  Catcher and  Hole Cardboard Main  Rail with End Deposi t Rail Expected to be done in: 1 st  Building Session And finalized in: One Day Plastic  Band Cardboard  Walls Motor Cleanin Station
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Groups Coordination Testing Meeting with other teams 4 5 Functional Egg Moving System Expected to be done in: 2 nd Building Session And finalized in: One Day Expected to be done in: 3 rd Building Session And finalized in: One Day Expected to be done in: 2 nd Lab Session And finalized in: One Day...
View Full Document

Ask a homework question - tutors are online