LAB2 - Highway Capacity Manual 2000 EXAMPLE PROBLEM 1(PART...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Highway Capacity Manual 2000 Chapter 21 - Multilane Highways 21-16 Example Problems EXAMPLE PROBLEM 1 (PART I) The Highway A 3.25-mi undivided four-lane highway on level terrain. A 3,200-ft segment with 2.5 percent grade also is included in the study. The Question What are the peak-hour LOS, speed, and density for the level terrain portion of the highway? The Facts Level terrain, 46.0-mi/h field-measured FFS, 11-ft lane width, 1,900-veh/h peak-hour volume, 13 percent trucks and buses, 2 percent RVs, and 0.90 PHF. Outline of Solution All input parameters are known. Demand will be computed in terms of pc/h/ln, and the LOS determined from the speed-flow diagram. An estimate of passenger-car speed is determined from the graph, and a value of density is calculated using speed and flow rate. Steps 1. Find f HV ( use Exhibit 21-8 and Equation 21-4 ). f HV = 1 1 + P T (E T – 1) + P R (E R – 1) f HV = 1 1 + 0.13(1.5 – 1) + 0.02(1.2 – 1) f HV = 0.935 2. Find v p ( use Equation 21-3 ). v p = V PHF * N * f HV * f p v p = 1,900 0.90 * 2 * 0.935 *1.00 v p = 1,129 pc/h/ln 3. Determine LOS ( use Exhibit 21-3 ). LOS C The Results LOS C, Speed = 46.0 mi/h, and Density = 24.5 pc/mi/ln.
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Highway Capacity Manual 2000 21-17 Chapter 21 - Multilane Highways Example Problems Example Problem 1 (Part I) 1 1 + P T (E T – 1) + P R (E R – 1) V or DDHV PHF * N * f HV * f p V or DDHV PHF * N * f HV * f p V or DDHV PHF * N * f HV * f p Analyst ___________________ Highway/Direction of Travel ________________ Agency or Company ___________________ From/To ________________ Date Performed ___________________ Jurisdiction ________________ Analysis Time Period ___________________ Analysis Year ________________ qq q q Operational (LOS) Design (N) Design (v p ) Planning (LOS) Planning (N) Planning (v p ) Volume, V ___________________veh/h Peak-hour factor, PHF _______________ Annual avg. daily traffic, AADT ___________________veh/day % Trucks and buses, P T _______________ Peak-hour proportion of AADT, K ___________________ % RVs, P R _______________ Peak-hour direction proportion, D ___________________ General terrain DDHV = AADT * K * D ___________________veh/h q Level q Rolling q Mountainous Driver type Grade: Length _______mi Up/Down ________% q Commuter/Weekday q Recreational/Weekend Number of lanes _______________ General Information Site Information Speed Inputs Calculate Speed Adjustments and FFS Operational, Planning (LOS); Design, Planning (v p ) Design, Planning (N) Glossary Factor Location Lane width, LW ___________________ft Total lateral clearance, TLC ___________________ft Access points, A ___________________A/mi Median type, M q Undivided q Divided FFS (measured) ___________________mi/h Base free-flow speed, BFFS ___________________mi/h f LW ____________mi/h f LC ____________mi/h f A ____________mi/h f M ____________mi/h FFS = BFFS – f LW – f LC – f A – f M ____________mi/h Application Input Output Operational (LOS) FFS, N, v p LOS, S, D Design (N) FFS, LOS, v p N, S, D Design (v p ) FFS, LOS, N v p , S, D Planning (LOS) FFS, N, AADT LOS, S, D Planning (N) FFS, LOS, AADT N, S, D Planning (v p ) FFS, LOS, N v p , S, D Operational (LOS) or Planning (LOS) Design (N) or Planning (N) 1st Iteration v p = ___________________pc/h/ln N _______________assumed S ___________________mi/h v p = _______________pc/h/ln D = v p /S ___________________pc/mi/ln LOS _______________ LOS ___________________ Design (v p ) or Planning (v p ) Design (N) or Planning (N) 2nd Iteration LOS ___________________ N _______________assumed v p ___________________pc/h/ln v p = _______________pc/h/ln V = v p * PHF * N * f HV * f p ___________________veh/h LOS _______________ S ___________________mi/h S _______________mi/h D = v p /S ___________________pc/mi/ln D = v p /S _______________pc/mi/ln f p ___________________ E R ____________________ E T ___________________ f HV = _______________ MULTILANE HIGHWAYS WORKSHEET E T - Exhibit 21-8, 21-9, 21-11 E R - Exhibit 21-8, 21-10 f p - Page 21-11 LOS, S, FFS, v p - Exhibit 21-2, 21-3 N - Number of lanes V - Hourly volume v p - Flow rate LOS - Level of service DDHV - Directional design-hour volume
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}

Page1 / 10

LAB2 - Highway Capacity Manual 2000 EXAMPLE PROBLEM 1(PART...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online