Assign2-2A-S.Fisher

Assign2-2A-S.Fisher - F B End t A C C St ar tA H E ar G F...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: F B End t A C C St ar tA H E ar G F BD E st D G 3.6 ( a) 2 5 1 3 10 8 6 (b) B-D-E-G the days that could stop completion of the project (c) 26 days ( d) Activity Slack A 13 B 0 C 11 D 0 E 0 F 11 G 0 3.10 3.11 ES = 0 EF =5 LS =4 LF = 2 Total project completion time: 21 Days Critical Path: B-E-G Activity Slack A 0 B 1 C 0 D 1 E 0 F 6 G H 0 1 ...
View Full Document

This note was uploaded on 07/13/2011 for the course ACCT 232 taught by Professor Hawk during the Spring '11 term at HCCS.

Page1 / 3

Assign2-2A-S.Fisher - F B End t A C C St ar tA H E ar G F...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online