Problem07-54

Problem07-54 - Setups: Rate x Hours or Runs Model A Model B...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Problem 7-54 Name: In the gray-shaded cells, enter the appropriate amounts or formulas. An asterisk (*) will appear in the column to the right of an incorrect amount. 1. Total Overhead / = Rate Overhead rate = Rate x ( DLH / Units ) = Overhead Cost per Unit Model A: Model B: 2. Dept. OH / Hours or Runs = Rate Setups per production run Inspections per inspection hour Machining per machine hour Maintence per maintenance hour Overhead assignment: Model A Model B
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: Setups: Rate x Hours or Runs Model A Model B Inspections: Model A Model B Machining: Model A Model B Maintenance: Model A Model B Total overhead Units produced Overhead per unit 3. Departmental rates: Overhead cost per unit: Model A Model B Department 1: Model A Total Machine Hours Model B Department 2: Model A Model B Total overhead Units produced Overhead per unit 4. (Key essay answer here)...
View Full Document

This note was uploaded on 07/13/2011 for the course ACC 202 taught by Professor Woollen during the Spring '08 term at Hawaii.

Page1 / 4

Problem07-54 - Setups: Rate x Hours or Runs Model A Model B...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online