Problem03-41

Problem03-41 - -/-= / = Fixed cost = -(Variable rate x...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
Problem 3-41 Name: Enter the appropriate amounts in the shaded cells. An asterisk (*) will appear in the column to the right of an incorrect amount. The scattergraph on the right will format as the amounts are entered. 1. Receiving Receiving Month Orders Cost 1 2 3 4 5 6 7 8 9 10 Does the relationship appear to be linear? Enter YES or NO in the answer box. 2. Receiving Activity Variable rate = (High point cost - Low point cost) / (High point orders - Low point orde
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: -/-= / = Fixed cost = -(Variable rate x Output at high point) = = Predicted cost for 1,450 orders: Fixed cost + (Variable rate x Output ) Total cost at high point 2 4 6 8 10 2 4 6 8 10 12 Scattergraph of Receiving Activity Cost 3. Predicted cost for the quarter: ( Months x Fixed cost ) + (Variable rate x Output ) Predicted cost for the year: ( Months x Fixed cost ) + (Variable rate x Output ) ers) 12...
View Full Document

This note was uploaded on 07/13/2011 for the course ACC 202 taught by Professor Woollen during the Spring '08 term at Hawaii.

Page1 / 4

Problem03-41 - -/-= / = Fixed cost = -(Variable rate x...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online