Site LTotals - $38,959 Site L Consumable Materials Proposed...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Site L Subcontractor Proposed Cost (Shea & Skanska) (a) $6,686,955 Material Requirements Report (MRR) Shea $736,800 Shea 849870 Shea 83025 Shea 1000 Shea 1000 Shea 75000 Shea 2500 Shea 10000 Shea 26875 Shea 10000 Shea 50000 Shea 10000 Shea 125000 Shea 1190 Shea 168 Shea 10625 Shea 21125 Shea 20560 Shea 36250 Shea 18275 Shea 300000 Shea 276480 Shea 1007760 Shea 240000 Subtotal $3,913,503 Skanska $36,000 Skanska 13500 Skanska 120687 Subtotal $170,187 Total Per Material Req. Report (b) $4,083,690 Difference Proposal versus MRR (a)-(b) $2,603,265
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Site L Permanent Materials Proposed Cost (Shea & Skanska) (a) $5,395,890 Material Requirement Report Shea 1887700 Shea 402150 Shea 68940 Shea 94000 Shea 67025 Shea 20500 Shea 105804 Shea 40950 Shea 2025000 Shea 10850 Shea 2000 Shea 101250 Shea 204000 Shea 37500 Shea Subtotal $5,067,669 Skanska 108575 Skanska 56700 Skanska 9720 Skanska 2700 Skanska 9450 Skanska 14917 Skanska 3500 Skanska 83700 Skanska Subtotal 289262 Total Per Material Req. Report (b) $5,356,931 Difference Proposal versus MRR (a)-(b)
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: $38,959 Site L Consumable Materials Proposed Cost (Shea & Skanska) (a) $3,129,190 Material Requirement Report Shea $100,000 Shea 6510 Shea 157515 Shea 185555 Shea 37500 Shea 331650 Shea 731090 Shea 29700 Shea 10500 Shea 1500 Shea 40000 Shea 20000 Shea 8500 Shea 90000 Shea 960 Shea 274300 Shea 8050 Shea 175125 Shea 32805 Shea 6000 Shea 5000 Shea 900 Shea 700 Shea 2000 Shea 6000 Shea 5000 Shea 750 Shea 210 Shea 21875 Shea 43000 Shea Subtotal $2,332,695 Skanska $13,882 Skanska 9661 Skanska 1000 Skanska 30150 Skanska 28478 Skanska 15300 Skanska 25000 Skanska 4250 Skanska 45000 Skanska 1020 Skanska 26000 Skanska 39375 Skanska Subtotal $239,116 Total Per Material Req. Report (b) $2,571,811 Difference Proposal versus MRR (a)-(b) $557,379...
View Full Document

{[ snackBarMessage ]}

Page1 / 3

Site LTotals - $38,959 Site L Consumable Materials Proposed...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online