Site L Subcontractor Proposed Cost (Shea & Skanska) (a) $6,686,955 Material Requirements Report (MRR) Shea $736,800 Shea $849,870 Shea $83,025 Shea $1,000 Shea $1,000 Shea 110000/40012 $7,500 (Corrected) Shea $2,500 Shea $10,000 Shea $26,875 Shea $10,000 Shea 110000/40012 $10,000 (Added) Shea $50,000 Shea $10,000 Shea $125,000 Shea $1,190 Shea $168 Shea $10,625 Shea 132300/40058 $25,125 (Corrected) Shea $20,560 Shea $36,250 Shea $18,275 Shea $300,000 Shea $276,480 Shea $1,007,760 Shea $240,000 Subtotal $3,860,003 Skanska $17,500 Skanska $32,975 Skanska $1,252,600 Skanska $37,500 Skanska $18,625 Skanska $204,000 Skanska $666,000 Skanska $107,625 Subtotal $2,336,825 (Corrected) Total Per Material Req. Report (b) $6,696,828 Difference Proposal versus MRR (a)-(b) -$9,873
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Site L Permanent Materials Proposed Cost (Shea & Skanska) (a) $5,395,890 Material Requirement Report Shea 1887700 Shea 402150 Shea 68940 Shea 94000 Shea 67025 Shea 20500 Shea 105804 Shea 40950 Shea 2025000 Shea 10850 Shea 2000 Shea 101250 Shea 204000 Shea 37500 Shea Subtotal $5,067,669 Skanska 16876 Skanska 56345 Skanska 29942 Skanska 6489 Skanska 811 Skanska 217600 Skanska Subtotal
Background image of page 2
Background image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 328063 Total Per Material Req. Report (b) $5,395,732 Difference Proposal versus MRR (a)-(b) $158 Site L Consumable Materials Proposed Cost (Shea & Skanska) (a) $3,129,190 Material Requirement Report Shea $100,000 Shea 6510 Shea 157515 Shea 185555 Shea 37500 Shea 331650 Shea 731090 Shea 29700 Shea 10500 Shea 1500 Shea 40000 Shea 20000 Shea 8500 Shea 90000 Shea 960 Shea 274300 Shea 8050 Shea 175125 Shea 32805 Shea 6000 Shea 5000 Shea 900 Shea 700 Shea 2000 Shea 6000 Shea 5000 Shea 750 Shea 210 Shea 21875 Shea 43000 Shea Subtotal $2,332,695 Skanska $40,618 Skanska 97447 Skanska 81660 Skanska 81660 Skanska 42587 Skanska 27200 Skanska 1633 Skanska 2722 Skanska 27764 Skanska 10880 Skanska 1307 Skanska 1078 Skanska 719 Skanska 256031 Skanska 13066 Skanska 7839 Skanska 102238 Skanska Subtotal $796,449 Total Per Material Req. Report (b) $3,129,144 Difference Proposal versus MRR (a)-(b) $46...
View Full Document

This note was uploaded on 07/14/2011 for the course MNCM 201 taught by Professor Sara during the Spring '11 term at Keller Graduate School of Management.

Page1 / 3

Reviewed & Corrected Site LTotals 1-4-2010 - 328063...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online