{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

AWO -24 CROSS PASSAGE NO 6 - AWO-24 CROSS PASSAGE NO 6...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
AWO -24 CROSS PASSAGE NO 6 EXCAVATION AND CONCRETE 2010/2011 RATES DESCRIPTION D/S/G HOURLY DAILY COST I. SHAFT & SERVICE CREW - EXCAVATION CRANE OPERATOR 1/1/1 113.71 $2,729.04 CRANE OILER 1/1/1 95.35 $2,288.40 MAN HOIST OPERATOR 1/1/1 98.67 $2,368.08 COMPRESSOR OPERATOR 1/1/1 83.99 $2,015.76 MECHANIC 1/1/1 101.92 $2,446.08 LOADER OPERATOR 1/1/1 102.23 $2,453.52 RIGGING FOREMAN 1/0/0 144.91 $1,159.28 RIGGERS 2/0/0 108.26 $1,732.16 TOP BELLMAN 3/3/3 100.40 $7,228.80 BOTTOM BELLMAN 2/2/2 100.40 $4,819.20 CHANGE HOUSEMAN 1/1/1 100.40 $2,409.60 LABOR FOREMAN 1/1/1 128.48 $3,083.52 LABORERS 2/2/2 100.40 $4,823.04 ELECTRICIAN 2/2/2 108.26 $5,196.48 SHIFT ENGINEER 1/1/1 104.63 $2,511.12 21/18/18 $47,264.00 456 HRS/DAY = $103.65/HR II. SHAFT & SERVICE CREW - CONCRETE ACTIVITIES CRANE OPERATOR 1/1 113.71 $1,819.36 CRANE OILER 1/1 95.35 $1,526.24 MAN HOIST OPERATOR 1/1 98.67 $1,578.72 COMPRESSOR OPERATOR 1/1 83.99 $1,343.84 MECHANIC 1/1 101.92 $1,630.72 LOADER OPERATOR 1/1 102.23 $1,643.68 RIGGING FOREMAN 1/1 144.91 $2,318.56 RIGGERS 2/2 108.26 $3,464.32 TOP BELLMAN 3/3 100.40 $4,819.20 BOTTOM BELLMAN 2/2 100.40 $3,212.80 CHANGE HOUSEMAN 1/1 100.40 $1,606.40 LABOR FOREMAN 1/1 128.48 $2,055.68 LABORERS
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

{[ snackBarMessage ]}