FinMan10e_SecSol_09

FinMan10e_SecSol_09 - TB4 TEST 1A (Concluded) 18. $10.28...

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
ACHIEVEMENT TEST SOLUTIONS—TEST 9 (Chapters 22–23) Fill-in-the-Blank Principles and Terminology 1. standard cost systems 2. theoretical (ideal) standards 3. principle of exceptions 4. variance 5. true 6. currently attainable (normal standards) 7. direct labor time variance 8. volume variance 9. controllable variance 10. factory overhead cost variance report 11. work in process 12. finished goods 13. cost of goods sold 14. controllable 15. currently attainable (normal) standards 16. noncontrollable 17. direct labor rate variance
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: TB4 TEST 1A (Concluded) 18. $10.28 19. investment center 20. transfer price 21. residual income 22. budget performance report 23. standard 24. $4.00 per payroll check 25. $6,400 26. unfavorable cost variance Problem 1 Problems 1. 11.9% 2. 15.9% TB4 TEST 1A (Concluded) 3. 1.8 4. 15% 5. $160,000 6. 7.5% Problem 2 1. $1,060 2. unfavorable 3. $1,640 4. unfavorable 5. $1890 6. favorable 7. $1,595 8. unfavorable 9. $4,000 10. unfavorable 11. $350 12. unfavorable...
View Full Document

Page1 / 4

FinMan10e_SecSol_09 - TB4 TEST 1A (Concluded) 18. $10.28...

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online