Ch06A_Process_Layout

Ch06A_Process_Layout - 17 88 125 99 180 4 100 17 20 5 25 5...

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
Current Layout Configuration Current Department Locations 1 2 3 4 8 7 6 5 Total Cost:$3,717 Assignment: Complete Department Name Dept # Assignment 1 OK Plastic Molding/Stamping 2 OK Metal Forming 3 OK Sewing 4 OK Small Toy Assembly 5 OK Large Toy Assembly 6 OK Painting 7 OK Mechanism Assembly 8 OK Process layout example shown in Exhibits TN5.1 - 5.8 Each department must be assigned a location within the layout once. Departments not assigned are identified as "Missing." Departments assigned more than once are identifed as "Multiple."
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Starting layout Page 2 1 3 5 7 2 4 6 8
Background image of page 2
Page 3 1 3 5 7 2 6 4 8
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Tn5.8 Page 4 1 6 7 3 4 2 5 8
Background image of page 4
TN5.7 Page 5 5 8 1 6 3 2 4 7
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Layout Evaluation Flow Data 1 2 3 4 5 6 7 8 1 175 50 0 30 200 20 25 2 175 0 100 75 90 80 90 3 50
Background image of page 6
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 17 88 125 99 180 4 100 17 20 5 25 5 30 75 88 20 180 187 6 200 90 125 5 374 103 7 20 80 99 180 374 7 8 25 90 180 25 187 103 7 Material Handling Cost A B C D E F G H Reference Locations 1 2 3 4 8 7 6 5 A B C D A 1 1 2 3 1 1 2 3 E F G H B 2 1 2 1 1 1 2 C 3 1 2 1 1 1 D 4 3 2 1 1 E 8 1 2 3 F 7 1 2 G 6 1 H 5 Resulting Flow x Cost Matrix 1 2 3 4 8 7 6 5 Current Layout 1 175 100 25 20 400 90 1 2 3 4 2 200 90 80 90 150 8 7 6 5 3 17 360 99 125 88 4 75 5 20 8 7 206 561 7 374 360 6 5 Total Cost: $3,717 132.75...
View Full Document

Page1 / 6

Ch06A_Process_Layout - 17 88 125 99 180 4 100 17 20 5 25 5...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online