Solved Problem 1 Week 3 4 5 6 7 8 9 X Gross Req'ts On-hand 0 0 0 0 0 0 0 0 Net Requirements LT = 1 Planned Rec't. Planned Releases 100 3 4 5 6 7 8 9 Y Gross Req'ts 200 On-hand 0 0 0 0 0 0 0 0 Net Requirements 200 LT =2 Planned Rec't. 200 Planned Releases 200 3 4 5 6 7 8 9 Z Gross Req'ts 300 On-hand 0 0 0 0 0 0 0 0 Net Requirements 300 LT = 3 Planned Rec't. 300 Planned Releases 300 3 4 5 6 7 8 9 A Gross Req'ts 600 200 On-hand 0 0 0
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 0 0 0 0 0 Net Requirements 600 200 LT = 2 Planned Rec't. 600 200 Planned Releases 600 200 3 4 5 6 7 8 9 B Gross Req'ts 400 On-hand 0 0 0 0 0 0 0 0 Net Requirements 400 LT = 1 Planned Rec't. 400 Planned Releases 400 3 4 5 6 7 8 9 C Gross Req'ts 1200 On-hand 0 0 0 0 0 0 0 0 Net Requirements 1200 LT = 3 Planned Rec't. 1200 Planned Releases 1200 10 100 0 100 100 10 0 10 0 10 0 10 0 10 0...
View Full Document

This note was uploaded on 07/17/2011 for the course MG 375 taught by Professor Fry during the Fall '09 term at Park.

Page1 / 2

Ch18_Solved_Problem - 0 0 0 0 0 Net Requirements 600 200 LT...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online