Formulas,5&6

Formulas,5&6 - 10. Cycle time = Operating time per...

Info iconThis preview shows page 1. Sign up to view the full content.

View Full Document Right Arrow Icon
Formulas (Chapters 5 and 6) 1. Efficiency = ___Actual output × 100% Effective capacity 2. Utilization = ___Actual output × 100% Design capacity 3. TC = FC + VC 4. VC = Q × v 5. TR = R × Q 6. P = Q (R – v ) – FC 7. Q = P + FC R – v 8. Q BEP = FC____ R – v 9. Output rate = Operating time per day Cycle time
Background image of page 1
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: 10. Cycle time = Operating time per day Desired output rate 11. N min = t _______ Cycle time 12. Percentage of idle time = Idle time per cycle_ 100 N actual Cycle time 13. Efficiency = 100% Percent idle time = Total time _ 100 N actual Cycle time...
View Full Document

Ask a homework question - tutors are online