{[ promptMessage ]}

Bookmark it

{[ promptMessage ]}

Class_Problem1_Productivity

Class_Problem1_Productivity - per hour for her time a...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1 OM 305 Dr. Robert Aboolian Productivity: Class Problem Joanna French is currently working a total of 12 hours per day to produce 240 dolls. She thinks that by changing the paint used for the facial features and fingernails that she can increase her rate to 360 dolls per day. Total material cost for each doll is approximately $3.50; she has to invest $20 in the necessary supplies (expendables) per day; energy costs are assumed to be only $4.00 per day; and she thinks she should be making $10
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full Document Right Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: per hour for her time. a) Viewing this from a total productivity perspective, what is her productivity at present and with the new paint? 2 b) How would total productivity change if using the new paint raised Ms. French±s material costs by $0.50 per doll? c) If she uses the new paint, by what amount could Ms. French±s material costs increase without reducing total (multifactor) productivity?...
View Full Document

{[ snackBarMessage ]}