Suggested Solution to 15 Mar 06 Q2_1164

Suggested Solution to 15 Mar 06 Q2_1164 - Q2.15thMarch2006

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Q2.                                                  15 th  March 2006 Identify key factors that determine an appropriate procurement option a  client could use for any particular project. Illustrate these factors using  examples where appropriate . The selection of the right procurement rout is critical to project success. In  addition to the tradition route, further ways or organizing the design and  construction processes must be considered to ensure that each client’s  individual set of requirement are met. There is no “one size fits all” solution for  construction project. Every client is different, and the needs of the same client  can change over time. The client’s requirements for both the design of the  building and the way in which it is required to be delivered must be critically  evaluated to inform the selection of the right procurement rout. There are eight basic issues that should be considered when selecting a 
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 2

Suggested Solution to 15 Mar 06 Q2_1164 - Q2.15thMarch2006

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online