K_Dalycis321_w2_ilab_milestone_2__poooc_matrix

K_Dalycis321_w2_ilab_milestone_2__poooc_matrix -...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Problems, Opportunities, Objectives, and Constraints Matrix Template Project: New Equipment Depot Project Manager:   Tanweer Haroon Created by: Kyle Daly Last Updated by: Kyle Daly Date Created: 7/12/11 Date Last Updated: 7/16/11 d6207ab535dabfac0ffb5bd93871c47b00788f32 Page 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
CAUSE AND EFFECT  ANALYSIS SYSTEM IMPROVEMENT OBJECTIVES Problem or Opportunity Causes and Effects System Objective System Constraint Checking in and out of equipment Process takes a long time.  Cause (s):Employees are doing both  checking in the equipment and out  equipment right when the store  opens.    Effect(s): Makes wait times  longer for checking in and  out of equipment. 1.    2.   Need to have a better check in and  check out process to help the  employees check in and out tools  easier. Unknown Lack of keeping records in order and  should have a better way to organized  all the employees records. Cause (s):
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 4

K_Dalycis321_w2_ilab_milestone_2__poooc_matrix -...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online