09 Textbook problems referred in LN C

09 Textbook problems referred in LN C - Bank Assets...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
Investment Return Amnt Invested Personal Loans < Bonds 10.0% 325000 162500 < Mortgages 8.5% 162500 Car Loans 9.5% 0 Personal Loans < Personal Loans 12.5% 162500 162500 < Total 10.25% 650000 650000 Personal Loans < 162500 < Maximize: C9 By Changing: D5:D8 Subject to: D9=D10 F5<=H5 F8<=H8 F11<=H11 D5:D8>=0 Bank Assets
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Bonds 325000 Mortgages 162500 25% of Total 162500
Background image of page 2
3.20 Page 3 Electric Gas Number to Make 30,000 10,000 Number to Buy 0 5,000 Cost to Make $55 $85 Cost to Buy $67 $95 Total Cost $2,975,000 Total Available 30,000 15,000 Total Needed 30,000 15,000 Resources Req'd Used Available Production 0.20 0.40 10,000 10,000 Assembly 0.30 0.50 14,000 15,000 Packaging 0.10 0.10 4,000 5,000 Weedwacker Company Minimize: E8 By Changing: B4:C5 Subject To: B10:C10=B11:C11 D14:D16<=E14:E16 B4:C5>=0
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
3.25 Page 4 Employees Employees Minimum Schedule to Available Employees Time Period (T.P.) Start @ T.P. During T.P. Needed 12 am to 4 am 90 90 90 4 am to 8 am 250 340 215 8 am to 12 pm 0 250 250 12 pm to 4 pm
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/10/2011 for the course BUSQOM 0050 taught by Professor Glowackia during the Spring '08 term at Pittsburgh.

Page1 / 8

09 Textbook problems referred in LN C - Bank Assets...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online