CIS321_W2_iLab_Milestone_2_Solution

CIS321_W2_iLab_Milestone_2_Solution - Week 2: Milestone 2...

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
Week 2: Milestone 2 Solution CIS321_W2_iLab_Milestone_2_Solution.docx Page 1 Project: Equipment Check-Out System Project Manager: (instructor name) Created by: (student name) Last Updated by: (student name) Date Created: (date) Date Last Updated: (date) CAUSE AND EFFECT ANALYSIS SYSTEM IMPROVEMENT OBJECTIVES Problem or Opportunity Causes and Effects System Objective System Constraint 1. It takes too long to process a single equipment check- out. Cause(s): 1. Employee and equipment records are maintained manually and are tedious to locate. Effect(s): 1. It takes 2 to 10 minutes to process a single equipment check- out. 2. There are lines of employees having to wait to check in and out tools at the end and beginning of each shift. 3. Employee resentment toward Equipment Depot is growing. 1. Reduce the amount of time it takes to process a single equipment check-out to less than two minutes. Unknown
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Week 2: Milestone 2 Solution CIS321_W2_iLab_Milestone_2_Solution.docx Page 2 CAUSE AND EFFECT ANALYSIS SYSTEM IMPROVEMENT OBJECTIVES Problem or Opportunity Causes and Effects System Objective System Constraint 2. It takes too long to process
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/17/2011 for the course CIS 321 taught by Professor Terranceschoonover during the Summer '11 term at DeVry Ft. Washington.

Page1 / 4

CIS321_W2_iLab_Milestone_2_Solution - Week 2: Milestone 2...

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online