WK4_AJakubow_LM - Service Request SR-rm-004 1 Service...

Info iconThis preview shows pages 1–5. Sign up to view the full content.

View Full Document Right Arrow Icon
Service Request SR-rm-004 1 Service Request SR-rm-004 Riordan Manufacturing Lori Mixson BSA/375 Due Monday, October 11, 2010 Instructor, Anastasia Jakubow University of Phoenix
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Service Request SR-rm-004 2 Table of Contents Title page______________________________________________________________1 Table of Contents_______________________________________________________2 Client Contact Information________________________________________________3 Consultant Contact Information____________________________________________3 Introduction___________________________________________________________4 Information-gathering techniques and design methods proposed for this project______4 Key factors____________________________________________________________5 The scope and feasibility of the project______________________________________5-6 application architecture and process design___________________________________6-7 Data Flow and protection _________________________________________________8 Implementation Process__________________________________________________9-12 Conclusion_______________________________________________________________12 References_____________________________________________________________13-14
Background image of page 2
Service Request SR-rm-004 3 Client Contact Information: Riordan Manufacturing Service Request SR-rm-004 Access Control Assessment Organization: Riordan Manufacturing Locations: All Plant Locations Consultant Contact Information: Lori Mixson (251) 988-1963 CrystalRaven@gulftel.com
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
4 Introduction The Client has requested our services to analyze the HR system to integrate the existing variety of tools in use today into a single integrated application. The company would like to take advantage of a more sophisticated, state-of-the art, information systems technology in our Human Resources department. Describe the information-gathering techniques and design methods you would propose to use for the project. Identify the key factors that help ensure the information required for the project is gathered successfully. Explain the scope and feasibility of the project. This response will provide the requested information as well as suggested resolutions to this matter. Information-gathering techniques and design methods proposed for this project. According to Riordan Manufacturing Intranet (Copyright 2003, 2004, 2006 © by Apollo Group, Inc.), "The company’s HRIS system was installed in 1992. It is a part of the financial systems package and keeps track of the employee information” (HRIS System, para. ). The proposed idea for the resolution would be an ERP this would be the fastest and cost effective way to bring the company up to date with the newer state of the art process of handling the HRIS information. This would bring everything together with faster as well as easier availability to the proper individuals. Key Factors
Background image of page 4
Image of page 5
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 13

WK4_AJakubow_LM - Service Request SR-rm-004 1 Service...

This preview shows document pages 1 - 5. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online