Homework 14 Solution

Homework 14 Solution - Develop a factored estimate for the...

Info iconThis preview shows pages 1–6. Sign up to view the full content.

View Full Document Right Arrow Icon
Reference Estimat Capacity (TPY) Equipment Cost Example Papermachine Speedup 80,000 $2,000,000 New Thickstock Pump 120,000 $120,000 Shoe Press 400,000 $7,000,000 Deinking System in New Building 70,000 $22,000,000 Recovery Boiler Rebuild 800,000 $8,000,000 Scoring TIC (+/-15%) Maximum Score New TSP $114,788 #NAME? #NAME? 250 Shoe Press $8,149,924 $28,756,924 3.53 250 Deinking $20,917,568 $82,859,790 3.96 250 Recovery Rebuild $10,246,634 $30,988,040 3.02 250 1000 Develop a factored estimate for the projects described in the Worksheets. The "Paperma find at least 5 factors that are not midpoint assumptions. Use you best thinking about wh your answers in the table below as illustrated. You must pick a Scale Factor and explain then develop the factors for estimating the installed cost. Color all the selected factors w and installed in 2012. The inflationary environment is low. All projects are "Cost Plus" (c on the "Instructions" worksheet and linked to your solution. Blue Cells are given and sh Your Equipment Cost should have come within +/-10% of solution or deduct 100 points. points. If the ratio of TIC to Equipment is less than 3.0 or greater than 4 .0 deduct 50 poin points for each omission. Minimum Score on each problem is Zero, Maximum is 250. Equipment Cost (+/- 10%) TIC to Equipment Ratio
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
te Scale Factor Inflation Factor Your P Year Capacity (TPY) Equipment Cost 2008 0.80 1.05 100,000 $2,521,633 2007 0.40 1.13 80,000 $114,788 2009 0.80 1.09 435,000 $8,149,924 2007 0.50 1.13 50,000 $20,917,568 2010 0.80 1.07 1,000,000 $10,246,634 Student Score Corrected Score 100 75 250 0 100 75 250 0 700 150 achine Speedup" is completed as a guide. In each estimate you should hich ones to change, and provide a basis for making the change. Enter why. You must adjust the reference quote for scale and inflation, and ith Green color as in the example. All project equipment is purchased (contractor fee + a profit) construction. All Pink Cells must be complete ould not be altered. Your TIC should have come within +/-15% of solution or deduct 100 ints. If you failed to set the red bold cells at the solution level deduct 10 Equipment and TIC Accuracy Score Deduct 10 points for each Red Bold number Not selected
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Total corrected score 850
Background image of page 4
Rationale for Scale Factor Year Installed Cost 2012 $8,794,822 Large Motors associated with speedup 2012 #NAME? Scaleup Factors Table
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 6
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/22/2011 for the course WPS 491 taught by Professor Phillips during the Spring '11 term at N.C. State.

Page1 / 31

Homework 14 Solution - Develop a factored estimate for the...

This preview shows document pages 1 - 6. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online