Scaleup Factors

Scaleup Factors - Area Information Product Capacity,...

Info iconThis preview shows pages 1–7. Sign up to view the full content.

View Full Document Right Arrow Icon
Area Information Basic Information Product Capacity, location, site requirements File estimates Process Flowshee Location General Description Soil bearing Railroads, roads, property line, fences Well-developed site facilities Equipment List Rough Sketches Preliminary list of equipment Engineered list of equipment Preliminary sizing and material specifications Engineered specifications Vessel sheets Preliminary General Arrangement Engineered General Arrangement Type Construction Foundations Architecture Preliminary Strucutural Design Detailed Drawings Rough Quantities (steam, water, power) Preliminary heat balance Preliminary flowsheets Engineered heat balance Engineered flowsheet Detailed Process and Instrumentation Diagrams Piping Engineered Flowsheet Piping layouts and schedules Rough specifications Buildings and Structures Utility Requirements
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Insulation Preliminary list of equipment and piping to be insulated Insulation specifications and schedules Instrumentation Preliminary instrument list Detailed Process and Instrumentation Diagrams Electrical Preliminary motor list Distribution specifications Preliminary lighting specifications Engineered single-line drawings Worker - Hours Preliminary Estimate Labor by Craft Supervision
Background image of page 2
FEL 1 FEL2 FEL3 Detailed Engineering Design
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 4
ClO2 Heat Exchanger Year Prepared 2007 Flow Calculations Units Pulp Max Flow Rate TPD 650 ClO2 Use Pound per Ton 40 ClO2 Concentration % 8 Stream Density Pounds per Gallon 8.4 Flow Rate Gallons per Minute 26.87 Pumps 1 2 3 Discharge Head FT 40 Pump Efficiency % 75 Pump GPM GPM 32.24 Brake HP HP 1 Cost $ 8000 Motors Motor Efficiency % 85 Motor HP HP 2 Size to Purchase HP 5 Set RPM RPM 1800 Cost per HP $ 700 Cost $ 3500 Heat Exchangers Area FT2 700 Type Materials Titanium Cost Basis $ per FT2 $130 Cost 91000 Civil/Strutural Heat Exchanger $ per FT2 15
Background image of page 5

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Pump $ per HP 40 Cost $ 10700
Background image of page 6
Image of page 7
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/22/2011 for the course WPS 491 taught by Professor Phillips during the Spring '11 term at N.C. State.

Page1 / 24

Scaleup Factors - Area Information Product Capacity,...

This preview shows document pages 1 - 7. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online