CNR bcp AAR 2009 edited

CNR bcp AAR 2009 edited - AfterActionReport/ImprovementPlan

Info iconThis preview shows pages 1–4. Sign up to view the full content.

View Full Document Right Arrow Icon
After Action Report/Improvement Plan College of Natural Resources (AAR/IP) Business Continuity Tabletop Exercise 2009  A PPENDIX  A: I MPROVEMENT  P LAN This IP has been developed specifically for the College of Natural Resources (CNR) as a result of the CNR Business Continuity Tabletop Exercise  conducted on August 28, 2009. These recommendations draw on both the After Action Report and the Exercise Hot Wash. Table A.1  Improvement Plan Matrix Capability Observation  Title Recommendation Corrective  Action  Description Capability  Element Primary  Responsible  Academic  Unit Person  Responsible Proposed Start  Date Proposed  Completion  Date apability 1:  [Evacuation  Strategy] Observation  1.1:  [Strength] -  CNR has a  designated  evacuation  assembly  area  documented  on the cover  page of the  business  continuity  and disaster  Remind faculty and staff  located of the  designated evacuation  assembly areas. Confirm with  faculty and staff  the location of  CNR evacuation  assembly areas. Training and  Awareness CNR Kirkman (work with  Barbara  White and  Safety  Committee) May 1, 2010 July 1, 2010 1
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
After Action Report/Improvement Plan College of Natural Resources (AAR/IP) Business Continuity Tabletop Exercise 2009  Capability Observation  Title Recommendation Corrective  Action  Description Capability  Element Primary  Responsible  Academic  Unit Person  Responsible Proposed Start  Date Proposed  Completion  Date recovery  plan. Verify that all sub  business continuity  plans within CNR have a  designated evacuation  assembly area  document in the plan.  Document the  location of the  evacuation  assembly  area(s) in the  plan overview  section of  LDRPS. Planning and  Policy  Development CNR Kirkman others as  appropriate ) May 1, 2010 August 1,  2010 The Department of  Business Continuity and  Disaster Recovery will  assist CNR with  receiving clarification  from Fire Protection  Division on the use of  emergency egress areas  Verify building  egress  procedure with  Fire Protection  Division.  Share the  results with  Training and  Awareness  Department  of Business  Continuity  and Disaster  Recovery  and CNR Kirkman June 1, 2010 Sept 1,  2010 2
Background image of page 2
After Action Report/Improvement Plan College of Natural Resources (AAR/IP) Business Continuity Tabletop Exercise 2009  Capability Observation  Title Recommendation Corrective  Action  Description Capability  Element Primary  Responsible  Academic  Unit Person  Responsible Proposed Start  Date Proposed  Completion  Date during building  evacuation across  campus. Schedule necessary 
Background image of page 3

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 4
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 12

CNR bcp AAR 2009 edited - AfterActionReport/ImprovementPlan

This preview shows document pages 1 - 4. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online