Quiz 2 - be useful Pg 38(Points 1 Nonlinear constraints Bottlenecks in the objective function Homogeneity Uncertainty Competing objectives 7 Which

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
Quiz 2 (WK2) 1. Linear programming is a single-objective model, meaning that it has a single objective function to be maximized or minimized, ( Pg 38 ). (Points : 1) True False 2. Finding the optimal product mix where several products have different costs and resource requirements cannot be solved using linear programming, ( Pg 38 ). (Points : 1) True False 3. If products and resources can not be subdivided into fractions, the condition of divisibility is violated. In these cases, a modification of linear programming called integral programming can be used, ( Pg 38 ). (Points : 1) True False 4. Project Management can be defined as planning, directing and controlling resources to meet the technical, cost and time constraints of the project, ( Pg 59 ). (Points : 1) True False 5. Most project work is controlled by PERT or CPM and thus team leadership is less crucial than in other parts of an organization, ( Pg ? ). (Points : 1) True False 6. Which of the following is an essential condition in a situation for linear programming to
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: be useful, ( Pg 38 )? (Points : 1) Nonlinear constraints Bottlenecks in the objective function Homogeneity Uncertainty Competing objectives 7. Which of the following is a common application of linear programming in operations and supply management, ( From DVD )? (Points : 1) Cycle counting analysis Cost of quality studies Cost allocation studies Plant location studies Product design decisions 8. A project can be subdivided into which of the following, ( Pg 62 )? (Points : 1) Job orders Subjobs Work Package Sub-paths Events and decisions 9. In a Gantt chart the horizontal axis is usually which of the following, ( Pages 64-65 )? (Points : 1) Activities Cost Profit Time Milestones 10. PERT is an abbreviation for which of the following methodologies, ( Pg 65 )? (Points : 1) Product Evaluation Result and Treatment Programming and Evaluation Realization Technology Program Evaluation and Review Technique Process Evaluation and Review Technology It is a name, not an abbreviation for anything...
View Full Document

This note was uploaded on 08/25/2011 for the course MGMT 375 taught by Professor Martinbrennan during the Summer '10 term at Park.

Page1 / 2

Quiz 2 - be useful Pg 38(Points 1 Nonlinear constraints Bottlenecks in the objective function Homogeneity Uncertainty Competing objectives 7 Which

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online