Quiz 3 - Quiz 3 (WK3) 1. Capacity planning involving...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
1. Capacity planning involving acquisition or disposal of fixed assets such as buildings, equipment or facilities is considered as which one of the following planning horizons? (Points : 1) Intermediate-range Long-range Short-range Current Upcoming 2. If the best operating level of a piece of equipment is at a rate of 400 units per hour and the actual output during an hour is 300 units, which of the following is the capacity cushion? (Points : 1) 33 percent 75 percent 90 percent 100 percent 133 percent 3. A process flowchart uses which of the following symbols to represent a decision point in a flow diagram? (Points : 1) Rectangle Arrow Inverted triangle Diamond A dashed line 4. Which following production process term best describes the situation when activities in a stage of production must stop because there is no work? (Points : 1) Blocking Buffering Starving Buffer Setup time
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Image of page 2
This is the end of the preview. Sign up to access the rest of the document.

This note was uploaded on 08/25/2011 for the course MGMT 375 taught by Professor Martinbrennan during the Summer '10 term at Park.

Page1 / 2

Quiz 3 - Quiz 3 (WK3) 1. Capacity planning involving...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online