Corrosion-Management-Steel-Jetty-Piles-Questionnaire

Corrosion-Management-Steel-Jetty-Piles-Questionnaire - PT....

Info iconThis preview shows pages 1–3. Sign up to view the full content.

View Full Document Right Arrow Icon
PT. Imbema Pacific Indonesia Please return this form to FAX: +62 (0)21 – 420 5417 or info@imbemaindonesia.com 1 | 3 JETTY PILE QUESTIONNAIRE Date: 1 Jetty / Location Name: 2 Owner: 3 Consultant: 4 Contractor: 5 Type of Structure: Materials Handled: 6 Location: Open Water Open Water Harbour Harbour Estuary River Exposed Sheltered Exposed Sheltered 7 Age of Jetty: 8 Pile Configuration: Round Square H Section Hexagonal Other 9 Number of Piles : Vertical? Raker? 10 Total Vertical Height of Protection Required: 11 Pile Dimensions: Diameter Perimeter Face Sizes 12 Pile Material: Steel Cast Iron Concrete Timber Other 13 Degree of Any Existing Corrosion: Heavy Moderate Light None
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
PT. Imbema Pacific Indonesia Please return this form to FAX: +62 (0)21 – 420 5417 or info@imbemaindonesia.com 2 | 3 14 Degree of Marine Growth at This Location: Heavy Moderate Light 15 Is Pollution Present? Please Comment: 16 Exposure to: Storms Wind Currents Wave Action 17 Obstructions on Pile: Cross Bracings Pipes
Background image of page 2
Image of page 3
This is the end of the preview. Sign up to access the rest of the document.

Page1 / 3

Corrosion-Management-Steel-Jetty-Piles-Questionnaire - PT....

This preview shows document pages 1 - 3. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online