Solution to lecture-2 illustration question

Solution to lecture-2 illustration question - overhead...

Info iconThis preview shows pages 1–2. Sign up to view the full content.

View Full Document Right Arrow Icon
SOLUTION TO LECTURE-2 ILLUSTRATION QUESTION 3-33 NOTE: Budgeted sales revenue, although given in the exercise, is irrelevant to the solution. 1. Predetermined overhead rate = (a) = $32.50 per machine hour (b) = $26.00 per direct-labor hour (c) = $2.00 per direct-labor dollar or 200% of direct-labor cost *Budgeted direct-labor cost = 25,000 × $13 2. Actual manufacturi ng
Background image of page 1

Info iconThis preview has intentionally blurred sections. Sign up to view the full version.

View Full DocumentRight Arrow Icon
Background image of page 2
This is the end of the preview. Sign up to access the rest of the document.

Unformatted text preview: overhead applied manufactur ing overhead = overapplied or underapplied overhead (a) $690,000 (22,000) ($32.50) = $25,000 overapplied overhead (b) $690,000 (26,000) ($26.00) = $14,000 underapplied overhead (c) $690,000 ($364,000 )(200%) = $38,000 overapplied overhead Actual direct-labor cost = 26,000 $14...
View Full Document

This note was uploaded on 08/26/2011 for the course ACCOUNTING 211 taught by Professor Min during the Three '11 term at Curtin.

Page1 / 2

Solution to lecture-2 illustration question - overhead...

This preview shows document pages 1 - 2. Sign up to view the full document.

View Full Document Right Arrow Icon
Ask a homework question - tutors are online